Protect the first lots of every new part.

Initial Production Control puts new and changed parts under extra checks until they prove stable. Plans, inspections, defects and the release decision are tracked in one place.

  • IPC plan for each new or changed part
  • Extra inspections and defect tracking per lot
  • Exit criteria and formal release to mass production
Digital QMS customersMaruti SuzukiBalaji Aluminium ExtrusionsBlazeFuzeTrigon Synergies
Quality engineer inspecting an automotive component during initial production
Sample

Bracket assembly · IPC-024

Under IPC · lot 6 of 10
Defects so far 0 ppm

Exit criteria

10 lots · zero customer complaints
Release Pending
Inside the module

What your team works with every day.

Switch between the main screens of Initial Production Control. In a live demo we show the same screens set up with your process.

Digital QMS · initial production control
Parts under IPC8
Lots checked46
Defects found3
Ready to release2
IPCPartReasonProgressStatus
IPC-024Bracket assemblyNew partLot 6 / 10Under IPC
IPC-023Flange 40 mm4M changeLot 10 / 10Ready to release
IPC-021Housing coverNew supplierLot 3 / 10Defect found
IPC-019Pin 8x30New dieReleasedReleased
LotDateQty checkedDefectsResult
Lot 624 Nov5000OK
Lot 522 Nov5000OK
Lot 420 Nov5001 burrContained
Lot 318 Nov5000OK
✓IPC planExtra checks, sample size and duration agreedDone
✓InspectionLots inspected and results recordedDone
3Exit reviewQuality reviews defects against exit criteriaIn review
4ReleasePart released to normal production controlPlanned

Sample data for illustration

Why teams switch

What changes on day one.

The problems below come up in almost every plant we visit. Here is how Initial Production Control handles each one.

✕

TodayNew parts run with the same checks as stable parts

✓

With Digital QMSNew and changed parts get extra checks until proven

✕

TodayIPC tracked on a whiteboard or a printed sheet

✓

With Digital QMSEvery lot, inspection and defect recorded against the part

✕

TodayNo clear rule for when IPC ends

✓

With Digital QMSExit criteria agreed upfront and checked before release

✕

TodayEarly defects reach the customer

✓

With Digital QMSIssues found in IPC are contained and raised as CAPA

How it works

One workflow, from start to closure.

Each step has an owner, a due date and a record, so nothing depends on memory or email.

1

Trigger

New part, new supplier or 4M change.

2

Plan

Extra checks, sample size and duration.

3

Inspect

Check each lot and record results.

4

Contain

Defects contained and raised as CAPA.

5

Review

Compare results with exit criteria.

6

Release

Release to normal production control.

Key features

Built for how your plant actually works.

Every feature is configured to your forms, roles and approval levels during setup.

IPC plan

Define extra inspections, sample sizes, duration and responsibilities for each part under IPC.

Lot-wise inspection

Record checks for every lot, with quantities, results and photos.

Defect tracking

Log defects found during IPC and link them to containment and CAPA.

Exit criteria

Set the rule for leaving IPC, such as number of lots with zero defects.

Release approval

Quality approves the release, recorded with name, date and results.

IPC dashboard

All parts under IPC, progress, defects and parts ready to release.

Who uses it

Every role sees what they need.

Access is set by role, so people see their own work first.

  • QualityPlans IPC, reviews results and approves release.
  • ProductionRuns the extra checks on the line for each lot.
  • NPD teamStarts IPC when a new part moves into production.
  • Plant headSees which parts are under IPC and any risks.
FAQ

Questions about Initial Production Control.

Need something else answered? Call us on +91 97165 30569 or send an enquiry.

What is Initial Production Control?

IPC is a period of extra checks on new or changed parts after production starts. It continues until the part meets agreed exit criteria, and then the part moves to normal production control.

What starts an IPC?

Usually a new part launch, a new supplier, or a 4M change such as a new die or machine. You decide which triggers apply.

How is the exit decided?

You set exit criteria in the IPC plan, for example a number of lots with no defects. Quality reviews the results and approves release.

Is it linked to NPD and Change Management?

Yes. Parts from NPD launches and approved changes can start IPC directly, and defects found during IPC can be raised as CAPA.

Ready when you are

See Initial Production Control on your own process.