IPC plan
Define extra inspections, sample sizes, duration and responsibilities for each part under IPC.
Initial Production Control puts new and changed parts under extra checks until they prove stable. Plans, inspections, defects and the release decision are tracked in one place.





Switch between the main screens of Initial Production Control. In a live demo we show the same screens set up with your process.
| IPC | Part | Reason | Progress | Status |
|---|---|---|---|---|
| IPC-024 | Bracket assembly | New part | Lot 6 / 10 | Under IPC |
| IPC-023 | Flange 40 mm | 4M change | Lot 10 / 10 | Ready to release |
| IPC-021 | Housing cover | New supplier | Lot 3 / 10 | Defect found |
| IPC-019 | Pin 8x30 | New die | Released | Released |
| Lot | Date | Qty checked | Defects | Result |
|---|---|---|---|---|
| Lot 6 | 24 Nov | 500 | 0 | OK |
| Lot 5 | 22 Nov | 500 | 0 | OK |
| Lot 4 | 20 Nov | 500 | 1 burr | Contained |
| Lot 3 | 18 Nov | 500 | 0 | OK |
Sample data for illustration
The problems below come up in almost every plant we visit. Here is how Initial Production Control handles each one.
TodayNew parts run with the same checks as stable parts
With Digital QMSNew and changed parts get extra checks until proven
TodayIPC tracked on a whiteboard or a printed sheet
With Digital QMSEvery lot, inspection and defect recorded against the part
TodayNo clear rule for when IPC ends
With Digital QMSExit criteria agreed upfront and checked before release
TodayEarly defects reach the customer
With Digital QMSIssues found in IPC are contained and raised as CAPA
Each step has an owner, a due date and a record, so nothing depends on memory or email.
New part, new supplier or 4M change.
Extra checks, sample size and duration.
Check each lot and record results.
Defects contained and raised as CAPA.
Compare results with exit criteria.
Release to normal production control.
Every feature is configured to your forms, roles and approval levels during setup.
Define extra inspections, sample sizes, duration and responsibilities for each part under IPC.
Record checks for every lot, with quantities, results and photos.
Log defects found during IPC and link them to containment and CAPA.
Set the rule for leaving IPC, such as number of lots with zero defects.
Quality approves the release, recorded with name, date and results.
All parts under IPC, progress, defects and parts ready to release.
Access is set by role, so people see their own work first.
Records move between modules, so nothing is entered twice.
Need something else answered? Call us on +91 97165 30569 or send an enquiry.
IPC is a period of extra checks on new or changed parts after production starts. It continues until the part meets agreed exit criteria, and then the part moves to normal production control.
Usually a new part launch, a new supplier, or a 4M change such as a new die or machine. You decide which triggers apply.
You set exit criteria in the IPC plan, for example a number of lots with no defects. Quality reviews the results and approves release.
Yes. Parts from NPD launches and approved changes can start IPC directly, and defects found during IPC can be raised as CAPA.

Book a 30-minute live demo. We will set it up with examples close to your plant.