4M change requests
Raise man, machine, material and method changes with reason, affected parts and planned date.
Change Management controls every 4M and engineering change: request, risk review, approvals, customer intimation, trial and verification, with a full record of who approved what.





Switch between the main screens of Change Management. In a live demo we show the same screens set up with your process.
| ID | Change | 4M type | Stage | Status |
|---|---|---|---|---|
| CR-031 | New die supplier | Material | Approval | Pending |
| CR-030 | Operator change on line 3 | Man | Training | In progress |
| CR-029 | Spindle replaced on CNC-04 | Machine | First-part check | In progress |
| CR-027 | Revised torque sequence | Method | Closed | Closed |
| Change | Check | Result | Docs | Status |
|---|---|---|---|---|
| CR-029 | First-part inspection | OK | Control plan R4 | Passed |
| CR-028 | Trial lot 500 pcs | OK | PFMEA R7 | Passed |
| CR-026 | Dimension report | 1 dim. NG | Pending | Rework |
Sample data for illustration
The problems below come up in almost every plant we visit. Here is how Change Management handles each one.
TodayChanges made on the line and told to quality later
With Digital QMSNothing changes until the request is approved
TodayRisk not checked against PFMEA and control plan
With Digital QMSRisk review is a required step before approval
TodayCustomer not informed of changes that need approval
With Digital QMSCustomer intimation is tracked for changes that require it
TodayNo proof the first parts after a change were checked
With Digital QMSFirst-part and trial results recorded before closure
Each step has an owner, a due date and a record, so nothing depends on memory or email.
Raise the 4M or engineering change.
Check PFMEA, control plan and impact.
Role-based approvals with comments.
Inform customer where required.
First-part and trial lot checks.
Update documents and close.
Every feature is configured to your forms, roles and approval levels during setup.
Raise man, machine, material and method changes with reason, affected parts and planned date.
Review impact on PFMEA, control plan and customer requirements before approval.
Approvers by change type and plant, each approval recorded with name, date and comments.
Track notifications and approvals for changes your customer must accept.
Record first-part inspection and trial results before the change is released.
Link the revised SOP, PFMEA and control plan so documents match the change.
Access is set by role, so people see their own work first.
Records move between modules, so nothing is entered twice.
Need something else answered? Call us on +91 97165 30569 or send an enquiry.
A change to man (operator), machine, material or method in a manufacturing process. Customers such as MSIL expect these changes to be controlled, approved and verified.
Yes. You set approvers for each change type and plant, such as quality, engineering and plant head.
First-part inspection and trial results are recorded in the change, along with the updated documents, before the change closes.
Yes. Changes during development are handled in NPD projects, and changes after launch are controlled here.

Book a 30-minute live demo. We will set it up with examples close to your plant.